I’ve completed the conceptual work for a pressure swing adsorption unit aimed at a niche gas-purification duty that falls outside the usual hydrogen, air-separation, or natural-gas templates. Now I’m moving… (Budget: ₹12500 – ₹37500 INR, Jobs: Aspen HYSYS, Chemical Engineering, Electrical Engineering, Engineering, Mechanical Engineering, Process Engineering, Project Management)
Leave a Reply